The HanssmannHess.lng Model

The Holt-Modigliani-Muth-Simon-Hanssmann-Hess production planning model

View the model
Download the model

Given a fluctuating demand forecast for each period in a planning horizon, what combination of: carrying inventory, backlogging, using overtime, and changing workforce level from period to period is the best way of meeting this demand?

Keywords:

Production Planning | Workforce Scheduling | Holt-Modigliani | Hanssmann-Hess |